Here are all the actual test exam dumps for IT exams. Most people prepare for the actual exams with our test dumps to pass their exams. So it's critical to choose and actual test pdf to succeed.

Verified API-1169 &As - Provide API-1169 with Correct Answers [Q137-Q154]

Share

Verified API-1169 Exam Dumps Q&As - Provide API-1169 with Correct Answers

Pass Your API-1169 Dumps Free Latest API Practice Tests

NEW QUESTION # 137
A weld must be removed if it has a crack that is more than ________ of the weld length.

  • A. 0
  • B. 1
  • C. 2
  • D. 1200 deg F

Answer: B


NEW QUESTION # 138
What % of pipes that are to be hydrotested, class 3 and Class 4 or at major crossings must also be NDT tested?
Standard?

  • A. 100%192.243
  • B. 90%
  • C. 100 ft
  • D. 10% except off-shore

Answer: D


NEW QUESTION # 139
Welder,s re-qualifying period is based on whether the pipe pressure produces a hoop stress of __________ than ______% of SMYS

  • A. more or less / 20
  • B. more or less / 19
  • C. more or less / 120
  • D. more or less / 10

Answer: D


NEW QUESTION # 140
Flammable Liquids

  • A. Area where the ground disturbance occurs within 50, of centerline of ROW, facility or easement
  • B. gouges, buckles, wrinkles, ripples or ovality,s
  • C. Class 1 liquids having a flash point below 100 deg F. Gasoline.
  • D. Minimum specified distance from welds and ends. Bending increments are distributed along length of bend.

Answer: D


NEW QUESTION # 141
__________ are intended to stop the flow of sediments and to prevent
the deposition of sediments beyond approved workspaces or into sensitive resources.

  • A. Design Validation
  • B. Distress
  • C. Sediment Ponds
  • D. Sediment Barriers

Answer: D


NEW QUESTION # 142
Which non-destructive testing method is specified in API 1104

  • A. Metallurgical Evaluation
  • B. RT Examination
  • C. Nick Break Test
  • D. Pressure Testing

Answer: D


NEW QUESTION # 143
Specific limits of acceptability apply to the process of product characteristics is the definition of?

  • A. Latitude/longitude coordinates (cga Best Practice 6.2)
  • B. Manufacturing acceptance criteria(api spec q1 3.1.15
  • C. Spike test(api 1110 4.1.7.2)
  • D. Acceptance criteria(API Spec Q1 3.1.1)

Answer: A


NEW QUESTION # 144
All buried pipe installed after _______ must be protected against corrosion by the following means:
1. and 2.

  • A. Valve protective caps
  • B. 1972 / 1. coating / 2. cathodic protection
  • C. grade, wall thickness or both
  • D. Coating condition of the pipe

Answer: D


NEW QUESTION # 145
Orange

  • A. Occupational Safety and Hazard Administration
  • B. Sewers and Drain Lines
  • C. Communication, Alarm or Signal Lines
  • D. Potable Water

Answer: C


NEW QUESTION # 146
Negative buoyancy requirements prevent

  • A. Combustible
  • B. Flotation
  • C. Incineration
  • D. Evaporation

Answer: B


NEW QUESTION # 147
Exceptions to installed pipe off shore between 12ft and 200 feet must be installed so that the top is below natural bottom is that it is held in place by___________(Exception , except in Gulf of Mexico) What standard covers this?

  • A. The transmission line must be protected.Subpart G 192.325
  • B. Identifying, documenting and oversee activity
  • C. Does
  • D. Stanchions, anchors, heavy anchors, heavy concrete coating or equivalent means.

Answer: C


NEW QUESTION # 148
Trench ratio for soil type A

  • A. 3/4:1
  • B. 1/2:1
  • C. 1 1/2:1
  • D. 5/1

Answer: D


NEW QUESTION # 149
On _______, check ANSI ratings, overall condition, trim, coating, operability, flange faced and/or bevels and body condition

  • A. Refuse
  • B. Valves
  • C. Permit
  • D. Does

Answer: D


NEW QUESTION # 150
PEL

  • A. Threshold limit value/ ceiling
  • B. Personal exposure level
  • C. Permissible exposure limit
  • D. Positive response

Answer: C


NEW QUESTION # 151
Define Combustible liquids

  • A. Liquids having a flashpoint at or above 100°F are known as class 11 liquids the most common or diesel fuel, class III liquids include jet fuel and motor oil
  • B. Document stating requirements(example quality manual, quality plan, technical drawing, procedure document, work instruction.)(ISO 9000 3.8.7)
  • C. Action to illuminate the cause of a non-conformity in to prevent recurrence.(correct of action is taken to prevent recurrence where as preventative action is taken to prevent occurrence)(ISO 9000 3.12.2)
  • D. Liquids having a flashpoint below 100°F are Known as class 1 liquids. The most common is gasoline

Answer: A


NEW QUESTION # 152
Slope (%) Spacing (feet)
5 - 15 ?
>15 - 30 ?
>30 ?

  • A. 0
  • B. 1
  • C. 50 ft
  • D. 2

Answer: C


NEW QUESTION # 153
All pipe installed off shore , under water not more than 200 ft (60) meters deep but less than 12 ft must have ______ in cover of rock. (except in the Gulf of Mexico and its inlets)

  • A. 0
  • B. 1
  • C. 2
  • D. API 1169

Answer: D


NEW QUESTION # 154
......

Get Top-Rated API API-1169 Exam Dumps Now: https://examtorrent.actual4test.com/API-1169_examcollection.html