Here are all the actual test exam dumps for IT exams. Most people prepare for the actual exams with our test dumps to pass their exams. So it's critical to choose and actual test pdf to succeed.

Valid SAP Certified Application Associate C-TS422-2020 Dumps Ensure Your Passing [Q24-Q43]

Share

Valid SAP Certified Application Associate C-TS422-2020 Dumps Ensure Your Passing

C-TS422-2020 Dumps Real Exam Questions Test Engine Dumps Training


SAP C-TS422-2020 Certification Exam Topics:

Topic AreasTopic Details, Courses, Books
Introduction to SAP S/4HANA Production Planning < 8%

Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning.

Material Requirements Planning in SAP S/4HANA 8% - 12%

Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures.

Advanced Planning in SAP S/4HANA > 12%

Outline the basics and master data of advanced planning,  explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts

Introduction to SAP S/4HANA Supply Chain Planning < 8%

Outline both motivation and background of SAP S/4HANA, describe its main components, the lines of business, and the SAP User Experience strategy.

Master Data in SAP S/4HANA > 12%

Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version.

Capacity Planning in SAP S/4HANA 8% - 12%

Outline best practices for using SAP S/4HANA, describe the SAP HANA database concept and new user experience with SAP Fiori, outline the capabilities of embedded analytics.

Process Orders in SAP S/4HANA < 8%

Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP).

Lean Manufacturing in SAP S/4HANA 8% - 12%

Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes.


 

NEW QUESTION 24
You want to schedule an operation finitely, without moving other operations. Which scheduling strategy do you select?

  • A. Scheduling working time only
  • B. Squeezing
  • C. Insert operation
  • D. Find Slot

Answer: D

 

NEW QUESTION 25
What are some uses for the low-level code assigned to each material? Note: There are 2correct answers to this question.

  • A. It is used by ATP to determine the priority of alternative components.
  • B. It is used in MRP to determine the sequence in which materials are planned.
  • C. It is used by engineering to identify sub items in an engineering bill of material(BOM).
  • D. It is used by product costing to determine how costs are rolled up.

Answer: B,D

 

NEW QUESTION 26
Which time elements are part of a routing operation? Note: There are 3 correct answers to this question.

  • A. Pick/pack time
  • B. Float before production
  • C. Wait time
  • D. Move time
  • E. Queue time

Answer: A,C,E

 

NEW QUESTION 27
What are the possible results of a production planning run inAdvanced Planning (PP/OS)? Note: There are 3 correct answers to this question.

  • A. Planned order
  • B. Scheduling agreement schedule line
  • C. Purchase requisition
  • D. Production order
  • E. Stock transport order

Answer: A,B,C

 

NEW QUESTION 28
Duringproduction order creation, several valid production versions are found. How does the system choose the product conversion?

  • A. Lot size or material cost
  • B. Validity period or sales order
  • C. Planned order or materialnumber
  • D. Alphanumeric or quota arrangement

Answer: D

 

NEW QUESTION 29
You need to model goods receipt processing time in Detailed Scheduling. Which modelling options do you have? Note: There are 2 correct answers to this question.

  • A. Model a separate resource inthe production data structure.
  • B. Model a handling resource in the location master and goods receipt time in the mater all master.
  • C. Model a transportation resource in the location master.
  • D. Model a resource inbound in the location master.

Answer: B,C

 

NEW QUESTION 30
You have maintained the parameters for simple discontinuation the material master of a component. Which business process will be affected if the available stockis zero and the discontinuation date is in the past?

  • A. Kanban
  • B. Material requirements planning
  • C. Production order release
  • D. Back flushing

Answer: B

 

NEW QUESTION 31
When do you use variant bills of materials (BOMB)?

  • A. When multiplematerial is have similar BOMB
  • B. When a material has multiple BOMB
  • C. When multiple material also have the same BOM
  • D. When a material has a configurable BOM

Answer: C

 

NEW QUESTION 32
Which time elements are relevant for lead t me scheduling of a product on order? Note: There are 2 correct answers to this question.

  • A. Planned delivery time
  • B. Setup time
  • C. Total replenishment lead time
  • D. Float after production

Answer: A,D

 

NEW QUESTION 33
Which actions does the system perform by default when you save aconfirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

  • A. Posting of production costs to the production cost collector
  • B. Archiving of documents for assembly scrap
  • C. Posting of goods receipt for the product
  • D. Reduction of associated capacity requirements
  • E. Material staging for next order in sequence

Answer: A,C,D

 

NEW QUESTION 34
You want to triggering-houseproduction of a semi-finished mater al before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

  • A. Planning at assembly level (70)
  • B. Planning with final assembly (40)
  • C. Make-to-order production (20)
  • D. Planning without final assembly (50)

Answer: D

 

NEW QUESTION 35
In a production process, you need acertain amount of liquid as input material. The source tank is directly connected to the reactor. How can you process consumption postings?

  • A. Kanban
  • B. Picking list
  • C. Transfer Order
  • D. Backflushing

Answer: B

 

NEW QUESTION 36
You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do? Note: There are 2 correct answers tothis question.

  • A. Set the creation indicator for purchase requisitions on the initial screen of the MRP run.
  • B. Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.
  • C. Add the agreement to the source list and mark itfor MRP relevance.
  • D. Add the agreement to the quota arrangement and mark it for MRP relevance.

Answer: B,C

 

NEW QUESTION 37
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?

  • A. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
  • B. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
  • C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
  • D. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator

Answer: A

 

NEW QUESTION 38
What does a line hierarchy in repetitive manufacturing represent?

  • A. A production line with an alternative sequence in the routing
  • B. A production line with prioritized alternative work centers
  • C. A production line with more than one work center
  • D. A production line with a parallel sequence in the routing

Answer: C

 

NEW QUESTION 39
What does forecasting in the demand planning cycle include? Note: There are 3 correct answers to this question.

  • A. Past procurement quantities
  • B. Past quotation quantities
  • C. One-off events
  • D. Market intelligence
  • E. Past sales order quantities

Answer: C,D,E

 

NEW QUESTION 40
You run MRP for a material that was planned using Demand-Driven Replenishment. Toward which buffer level does the MRP run create a replenishment proposal?

  • A. Top of Red
  • B. Top of Red Base
  • C. Top of Yellow
  • D. Top of Green

Answer: D

 

NEW QUESTION 41
Which master data object governs the relationship between supply source and demand source in the Kanban process?

  • A. Rate routing
  • B. Control cycle
  • C. Replenishment strategy
  • D. Production supply area

Answer: B

 

NEW QUESTION 42
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.

  • A. Functional Location BOM
  • B. Class BOM
  • C. Work Center BOM
  • D. Sales Order BOM

Answer: A,D

 

NEW QUESTION 43
......


C-TS422-2020 Exam Certification Details:

Sample Questions: SAP C-TS422-2020 Exam Sample Question
Level:Associate
Exam:80 questions
Cut Score:56%

 

SAP C-TS422-2020: Selling SAP Certified Application Associate Products and Solutions: https://examtorrent.actual4test.com/C-TS422-2020_examcollection.html