
[UPDATED 2023] SAP C_TS422_1909 Questions Prepare with Free Demo of PDF
NEW 2023 Certification Sample Questions C_TS422_1909 Dumps & Practice Exam
SAP C_TS422_1909 Certification Exam Topics:
| Topic Areas | Topic Details, Courses, Books |
|---|---|
| Advanced Planning in SAP S/4HANA > 12% | Outline the basics and master data of advanced planning, explain tools (alert monitor, detailed scheduling planning board) and advanced planning and detailed scheduling processes, explain planning evaluation concepts |
| Process Orders in SAP S/4HANA < 8% | Characterize process order elements and process order processing, determine master data objects for process orders, identify features for Good Manufacturing Practices (GMP). |
| Demand Management in SAP S/4HANA < 8% | Explain and compare the different production methods in make-to-order, make-to-stock, and assembly planning. |
| Material Requirements Planning in SAP S/4HANA 8% - 12% | Select and apply planning strategies, use the planning table, characterize long-term planning and master production scheduling, outline MRP basics and steps of MRP, and describe lot size procedures. |
| Introduction to SAP S/4HANA Production Planning < 8% | Outline production planning components and functions, differentiate consumption-based planning vs. MRP, outline new trends in production planning. |
| Lean Manufacturing in SAP S/4HANA 8% - 12% | Identify repetitive manufacturing specific master data, explain line load planning and confirmation, outline Kanban master data and Kanban processes. |
| Master Data in SAP S/4HANA > 12% | Identify and explain production relevant master data, including, but not limited to: bill of material, routing and production version. |
| Production Orders in SAP S/4HANA > 12% | Determine BOM item category, describe order status management and set user statuses, configure availability check for components, trigger routing selection, set up an order type, apply material staging and confirmation. |
NEW QUESTION 13
You want to procure your material components based on a forecast for the finished material derived from historical sales. When customers order, you produce the finished product and reserve it for that particular order.
Which is the appropriate planning strategy to use?
Please choose the correct answer.
Response:
- A. Make-to-order production (20)
- B. Planning without final assembly (50)
- C. Production by lot size (30)
- D. Planning with final assembly (40)
Answer: B
NEW QUESTION 14
You want to set up a make-to-order planning scenario for a finished material. Some components from the bill of materials (BOM) should be procured per sales order, other components should be procured for various requirements. Fore casting is NOT possible. Which settings do you make to achieve this?
- A. Planning strategy 50 (Planning without final assembly) and the corresponding individual Collective Indicator.
- B. Planning strategy 50 (Planning without final assembly) and the corresponding Mixed MRP indicator
- C. Planning strategy 20 (Make-to-Order) and the corresponding individual Collective indicator
- D. Planning strategy 20 (Make-to-Order) and the corresponding Mixed MRP indicator
Answer: A
NEW QUESTION 15
Which bill of material (BOM) categories can you define in SAP S/4HANA? Note: There are 2 correct answers to this question.
- A. Work Center BOM
- B. Class BOM
- C. Functional Location BOM
- D. Sales Order BOM
Answer: C,D
NEW QUESTION 16
In which data objects do you maintain the production line as the work center for repetitive manufacturing?
Note: There are 2 correct answers to this question.
- A. Production cost collector
- B. Routing
- C. Repetitive manufacturing profile
- D. Production version
Answer: B,D
NEW QUESTION 17
In the Manage Shortage view of the new SAP Fiori app "Monitor Material Coverage", what do the stars indicate?
Please choose the correct answer.
Response:
- A. The priority of the proposed solution
- B. The presence of production orders
- C. The viability of the proposed solution
- D. The presence of firmed planned orders
Visit us athttp://examcertify.com/C_TS422_1909.html
Answer: C
NEW QUESTION 18
When would you use reporting point backflush in repetitive manufacturing?
There are 2 correct answers to this question.
Response:
- A. You require an up-to-date inventory for components
- B. When you need to determine the work in progress
- C. For production lines with short lead times
- D. When goods issues can wait for final confirmation
Answer: B,D
NEW QUESTION 19
Which functional capabilities does the Detailed Scheduling Board have?
There are 2 correct answers to this question.
Response:
- A. Change sales order quantities
- B. Enter time-ticket confirmation for production orders
- C. Undo for drag & Drop planning activities
- D. Change planned order quantities
Answer: C,D
NEW QUESTION 20
Where does the system check master data selection settings during the creation of planned orders and production orders? Note: There are 3 correct answers to this question.
- A. In the production version
- B. In the bill of materials (BOM)
- C. In the routing
- D. In the MRP controller
- E. In the production order type
Answer: C,D,E
NEW QUESTION 21
What are some of the advantages of using Kanban?
There are 2 correct answers to this question.
Response:
- A. It is a simplified form of production control
- B. It is mostly accomplished by manual postings
- C. Replenishments are based on centralized planning
- D. Replenishments are created close to the actual need
Answer: A,D
NEW QUESTION 22
Which warehouse management functions are available in SAP EWM but NOT in SAP WM?
There are 3 correct answers to this question.
Response:
- A. Yard Management
- B. Expected goods receipt
- C. Handling Unit Management
- D. Labor Management
- E. Slotting
Answer: B,D,E
NEW QUESTION 23
You are using the document management system (DMS) . Where should the DMS document links be assigned, to have them automatically copied to production orders?
There are 2 correct answers to this question.
Response:
- A. Work center
- B. Bill of material
- C. Material master
- D. Routing header
Answer: B,C
NEW QUESTION 24
The production plan is being disrupted by last minute demands that are entered in the system. Which is the most efficient way to handle last minute demands and protect the current production plan?
There are 2 correct answers to this question.
Response:
- A. Manually firm all planned orders for materials within the replenishment lead time of the material
- B. In the material master record, set MRP type to P4 and a planning time fence on the replenishment lead time of the material
- C. In the stock requirements list, set a manual firming fence for a date based on the replenishment lead time of the material
- D. In the material master record, set MRP type to P1 and a planning time fence on the replenishment lead time of the material
Answer: C,D
NEW QUESTION 25
What does the industry sector determine? Note: There are 2 correct answers to this question.
- A. Whether material numbers are assigned internally or externally
- B. Which material master views can be maintained
- C. Whether a material master field is required, changeable, displayed, or hidden
- D. Which transaction you can use to create a new material
Answer: B,C
NEW QUESTION 26
In a first step you have created master recipes. In which sequence are the additional objects created?
Please choose the correct answer.
Response:
- A. Control recipe
Process order
PI sheet - B. Process message
Control recipe
Process order
Process message
PI sheet - C. Process order
Control recipe
Process message
PI sheet - D. Process order
Control recipe
PI sheet
Process message
Answer: D
NEW QUESTION 27
What are drawbacks of the separation of OLTP and OLAP?
There are 4 correct answers to this question.
Response:
- A. Batch process are required to keep OLTP and OLAP in sync
- B. Only the OLAP system has a predefined subset of the data
- C. Only the OLAP system has the latest data
- D. Multiple copies of the data exist
- E. The OLAP system needs to write back the data to the OLTP system
Answer: A,B,D,E
NEW QUESTION 28
What could be the reason for multiple commitment of individual capacities, where several operations have the same scheduled dates on a resource after capacity planning? Note: There are 2 correct answers to this question.
- A. The planning strategy is infinite.
- B. Alternative resources are fully occupied.
- C. The Change Planning Direct on indicator is set.
- D. The work center has several individual capacities.
Answer: A,D
NEW QUESTION 29
Your project team decides to use a make-to-order planning strategy for a strategic material in discrete manufacturing. What is the impact of this decision? Note: There are 3 correct answers to this question.
- A. Net requirements calculation is sales order-specific.
- B. Sales order-specific stock is created
- C. Production orders are created with sales order reference.
- D. Storage location MRP areas are required.
- E. Sales order-specific planning run is required.
Answer: A,B,C
NEW QUESTION 30
Which of these are layers in SAP Best Practice content?
There are 3 correct answers to this question.
Response:
- A. Scope items
- B. Configuration guides
- C. Building blocks
- D. Solution packages
- E. Process diagrams
Answer: A,C,D
NEW QUESTION 31
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider? Note: There are 2 correct answers to this question.
- A. The maximum mater all number length is 40 for external numbers and 18 for internal numbers.
- B. In Customizing you can decide by material type whether to use the long material number.
- C. The display template for material numbers applies to all clients.
- D. The number of leading zeros for internal numbers is client-specific.
Answer: A,C
NEW QUESTION 32
......
C_TS422_1909 Deluxe Study Guide with Online Test Engine: https://examtorrent.actual4test.com/C_TS422_1909_examcollection.html